top of page
googleb2c6241a5e019745.html
MOBILE BATTERY ENERGY STORAGE (BESS) AND EV CHARGING
Mobile Power for Every Operation.
_____
Grid in a Box
Up to 240kW ultra-rapid charging,
DC and AC for up to 10 vehicles.
No DNO application. No grid upgrade. No waiting.

Charge Qube combines 240kW ultra-rapid charging with flexible battery storage in one modular, self-contained unit. No Distribution Network Operator (DNO) application, no reinforcement costs, no months of waiting, because it runs from a standard 16A or larger connection. No grid upgrade required.
£2.40 per CHARGE
Recharge a Charge Qube CQ450 overnight from £24*, delivering up to 10 EV charges from a single cycle.
*Estimated figures based on reduced overnight electricity tariffs and typical charging assumptions.

bottom of page
